Design of a cyclic flow line of transportation of ore of pits of TOO "Zhayremsky Gorno-obogatitelny kompleks"

Design of a cyclic flow line of transportation of ore of pits of TOO "Zhayremsky Gorno-obogatitelny kompleks" Construction of the shop of crushing and gravitational enrichment of Pb-Ba of ores Zhairem GOK Ushkatyn field-3.
This work was performed "turnkey" (EPCM). Since the beginning of design before start of an object in operation – 6 months.
In the shop the following processing equipment is installed:
• Concentrators Knelson CVD 64''
• Grokhota "Derrick"
• Hydroclone installations
• Skrubber-butary SB-18

Body of filtration and shipment of concentrates of OF ZHGOK
The modern highly effective equipment is installed. Project decisions on simultaneous loading of two cars on one way are applied, loading in cars and loading in big-run.