Concentrating production

Reconstruction of ZIF TOO "Altyntau Kokshetau"

Reconstruction of ZIF TOO "Altyntau Kokshetau"

Reconstruction of ZIF for achievement of performance of 8 million tons of ore a year. This work was performed "turnkey" (EPCM), beginning from the idea and finishing with reaching design capacity.
TOO Kazzinc. Riddersky GOK. Concentrating factory No. 2. Construction of the body of large-volume flotation machines

TOO Kazzinc. Riddersky GOK. Concentrating factory No. 2. Construction of the body of large-volume flotation machines

Concentrating factory No. 2. Construction of the body of large-volume TankCell 50 flotation machines of the Outotec company. The body was designed "from scratch" and intended for expansion of the front of flotation with receiving a collective concentrate for the purpose of increase in overall performance of concentrating factory.
Design of a cyclic flow line of transportation of ore of pits of TOO "Zhayremsky Gorno-obogatitelny kompleks"

Design of a cyclic flow line of transportation of ore of pits of TOO "Zhayremsky Gorno-obogatitelny kompleks"

Design of a cyclic flow line of transportation of ore of pits "Western" and Dalnezapadny. A stage "Project" for the feasibility study (FS, 2016). Performance is 5 million tons/year. Quantity of stages of crushing - 3. Total length of conveyor lines: 4 km.
Feasibility study for expediency of working off the Shanuch field

Feasibility study for expediency of working off the Shanuch field

In 2012 - the feasibility study for expediency of working off the Shanuch field (Bystrinsky district of Kamchatka Krai, the Russian Federation). The option of working off the Mine considered by underground mode and assessment of offers on optimization has been given:
• working off of all stocks, engaging on additional ore bodies and with kickdown of onboard contents on nickel;
• schemes of power supply, capital and operating costs, and risk assessment.